ByteBrief
We're a portrait publication through and through. Turn your phone back and your briefing picks up right where you left it.
(We tried widescreen once. It wasn't us.)

Analysts at Semiaccurate state SpaceX could build 10 GW of data center capacity by 2027, surpassing Google's lifetime output. The plan relies on 89 turbines and 1377 Tesla Megapacks, though emissions rules limit turbine use to 1.24 GW. A 300 MW shortfall requires battery backup, with a temporary agreement allowing extra turbine operation until July 2027.
Tap to vote and see what everyone thinks.
Summary by ByteBrief