Iren signed a five-year $3.4 billion deal with Nvidia for 60 MW in Texas. The company doubled its pipeline to 5.8 GW in under six months by adding sites in Australia, Oklahoma, and Europe. Iren's 1.4 GW Sweetwater 1 facility was energized this year, with the Australian site expected in 2028.
Tap to vote and see what everyone thinks.