ByteBrief
We're a portrait publication through and through. Turn your phone back and your briefing picks up right where you left it.
(We tried widescreen once. It wasn't us.)
Brookfield and Drax sign an agreement to jointly develop an AI data center at the Drax Power Station in North Yorkshire. The project targets up to 100 megawatts of capacity operational from the first quarter of 2028, with an additional 500 MW brought online between 2028 and 2031.
Tap to vote and see what everyone thinks.
Summary by ByteBrief