ByteBrief
We're a portrait publication through and through. Turn your phone back and your briefing picks up right where you left it.
(We tried widescreen once. It wasn't us.)

Engineers for the Texas Department of Transportation's $4.5 billion Interstate 35 reconstruction used digital twins to redesign a drainage tunnel system. This approach completed four preliminary studies in 3 months instead of 12, saving an estimated $200 million. The final design spans 6 miles of 22-foot-diameter tunnels positioned nearly 200 feet below ground in Austin, Texas.
Tap to vote and see what everyone thinks.
Summary by ByteBrief