
A top Nvidia executive stated that water concerns for data centers could be largely addressed by the company's next generation of AI infrastructure. Nvidia announced at London Climate Week that its latest AI system can be fully cooled with liquid warm enough to reduce the need for additional chilling equipment.
Tap to vote and see what everyone thinks.
Summary by ByteBrief
Introducing Brazos: Bringing liquid cooling to air-cooled data centers