ByteBrief
We're a portrait publication through and through. Turn your phone back and your briefing picks up right where you left it.
(We tried widescreen once. It wasn't us.)

Meta completed the first phase of its Prometheus gigawatt-scale supercluster in New Albany, Ohio, training the Muse family of models. The site now holds hundreds of thousands of GPUs with over 54,000 GPU hours of mean time between interruptions. The facility utilizes closed-loop liquid cooling and plans to scale to roughly 1 million GPUs eventually.
Tap to vote and see what everyone thinks.
Summary by ByteBrief