
Training frontier AI models requires wiring hundreds of thousands of chips to act as one computer. xAI built Colossus in Memphis, reaching 100,000 liquid-cooled NVIDIA H100 GPUs in 122 days and doubling to 200,000 in 92 more. The buildout behind such machines is projected to consume over $300 billion.
Tap to vote and see what everyone thinks.
Summary by ByteBrief
SpaceX: The AI IPO Wearing A Spacesuit