ByteBrief
We're a portrait publication through and through. Turn your phone back and your briefing picks up right where you left it.
(We tried widescreen once. It wasn't us.)
Taylor Frazier McCollum led a grassroots campaign that gathered over 25,000 signatures to stop a proposed $5 billion data center in Landover, Maryland. The project, which would have occupied more than 80 acres, was set to break ground between 2026 and 2027. Local protests successfully prompted multiple county moratoriums on data center development, halting the construction plans.
Tap to vote and see what everyone thinks.
Summary by ByteBrief