Tetra Tech was selected as lead design engineer for the Progressive Design-Build Hydropower Dam Spillway Modernization Project for Chelan County PUD. The multi-year contract covers new spillway infrastructure at Rock Island Dam and Rocky Reach Dam on the Columbia River to improve operational reliability and safety.
Tap to vote and see what everyone thinks.
AI Provides Speed And Precision For Construction Takeoffs & Bids
Summary by ByteBrief