ByteBrief
We're a portrait publication through and through. Turn your phone back and your briefing picks up right where you left it.
(We tried widescreen once. It wasn't us.)

Infineon Technologies AG plans to invest around €1.1 billion in its Villach site by 2034 to expand high-volume manufacturing of gallium nitride power semiconductors. The German chipmaker achieved a breakthrough in 2024 by transitioning to 300-millimetre wafers, boosting production volume by a factor of 2.3.
Tap to vote and see what everyone thinks.
Summary by ByteBrief