ByteBrief
We're a portrait publication through and through. Turn your phone back and your briefing picks up right where you left it.
(We tried widescreen once. It wasn't us.)

Nscale's £2bn data centre in Essex has planning permission and a 90-megawatt grid connection but no power arriving in time to open next year. The British AI firm, backed by Nvidia with Microsoft as anchor tenant, is now shopping for on-site generation including talks with a California fuel-cell maker.
Tap to vote and see what everyone thinks.
Summary by ByteBrief