ByteBrief
We're a portrait publication through and through. Turn your phone back and your briefing picks up right where you left it.
(We tried widescreen once. It wasn't us.)
SpaceX will build natural gas power plants with large battery arrays for its Terafab semiconductor factory in Grimes County, Texas, skipping Tesla solar panels. The fab, costing $16.8 billion initially, will make chips for SpaceX and xAI data centers, with $2.8 billion planned for gas turbines.
Tap to vote and see what everyone thinks.
Summary by ByteBrief