ByteBrief
We're a portrait publication through and through. Turn your phone back and your briefing picks up right where you left it.
(We tried widescreen once. It wasn't us.)
Rail Infrastructure Development Company Karnataka Ltd floats a tender for the European Train Control System Level-2 on Bengaluru suburban rail corridors 2 and 4. The signalling infrastructure costs Rs 1,017 crore. Integral Coach Factory will manufacture 51 stainless steel trains by 2027-28, replacing the earlier CBTC plan to improve safety and reduce land acquisition needs.
Tap to vote and see what everyone thinks.
Summary by ByteBrief