ByteBrief
We're a portrait publication through and through. Turn your phone back and your briefing picks up right where you left it.
(We tried widescreen once. It wasn't us.)
TSMC plans to increase 2nm wafer fabs in Taiwan from seven to ten, adding three in Tainan. Each new fab costs about NT$300 billion ($9.3 billion), totaling NT$900 billion ($28 billion). Mass production is expected by 2026 to meet AI chip demand.
Tap to vote and see what everyone thinks.
Summary by ByteBrief